Sanehwal – New Morinda Junction
Sanehwal – New Morinda Junction (SNL–NMDA) railway line: 53 km, single electric broad gauge. 5 stations and 29 trains, Northern Railway.
- Length
- 53 km
- Speed limit
- 110 km/h
- Trains
- 29 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 5
- Sanehwal SNL 0.0 km
- Lall Kalan LLKN 14.0 km
- Samrala SMRL 21.6 km
- Khamanon KMNN 35.9 km
- New Morinda Jn NMDA 53.3 km
Quick answers
How long is the Sanehwal – New Morinda Junction line?
The Sanehwal – New Morinda Junction line is about 53 km long, with 5 stations.
Is the Sanehwal – New Morinda Junction line electrified?
Yes. The Sanehwal – New Morinda Junction line is electrified: trains run on electric power from overhead wires.
Is Sanehwal – New Morinda Junction a single or double line?
The Sanehwal – New Morinda Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Sanehwal and New Morinda Junction?
Trains can run at up to 110 km/h between Sanehwal and New Morinda Junction.
How many trains use the Sanehwal – New Morinda Junction line?
29 trains run over the Sanehwal – New Morinda Junction line.