RailTribe
Lines
Map
Trains
Line

Sanjivaiah Park Bridge Cabin – Secunderabad Junction

Sanjivaiah Park Bridge Cabin – Secunderabad Junction (XX-SJVB–SC) railway line: 4 km, double electric broad gauge. 4 stations and 145 trains, South Central Railway.

Length
4 km
Trains
145 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 4

  1. XX-SJVB XX-SJVB 0.0 km
  2. Sanjivaiah Park SJVP 1.0 km
  3. James Street JET 2.1 km
  4. Secunderabad Jn SC 3.8 km

Quick answers

How long is the Sanjivaiah Park Bridge Cabin – Secunderabad Junction line?

The Sanjivaiah Park Bridge Cabin – Secunderabad Junction line is about 4 km long, with 4 stations.

Is the Sanjivaiah Park Bridge Cabin – Secunderabad Junction line electrified?

Yes. The Sanjivaiah Park Bridge Cabin – Secunderabad Junction line is electrified: trains run on electric power from overhead wires.

Is Sanjivaiah Park Bridge Cabin – Secunderabad Junction a single or double line?

The Sanjivaiah Park Bridge Cabin – Secunderabad Junction line is a double line. One track for each direction, so trains do not wait to cross.

How many trains use the Sanjivaiah Park Bridge Cabin – Secunderabad Junction line?

145 trains run over the Sanjivaiah Park Bridge Cabin – Secunderabad Junction line.

Indian railway atlas