Saraigarh Junction – Lalitgram
Saraigarh Junction – Lalitgram (SRGR–LLP) railway line: 31 km, single electric broad gauge. 7 stations and 21 trains, East Central Railway.
- Length
- 31 km
- Trains
- 21 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 7
- Saraigarh Jn SRGR 0.0 km
- Narayanpur Murli Halt NRPM 6.4 km
- Raghopur RGV 11.1 km
- Ram Bishanpur RBQ 15.1 km
- Pratapganj PPV 22.5 km
- XX-LLPA XX-LLPA 29.2 km
- Lalitgram LLP 30.5 km
Quick answers
How long is the Saraigarh Junction – Lalitgram line?
The Saraigarh Junction – Lalitgram line is about 31 km long, with 7 stations.
Is the Saraigarh Junction – Lalitgram line electrified?
Yes. The Saraigarh Junction – Lalitgram line is electrified: trains run on electric power from overhead wires.
Is Saraigarh Junction – Lalitgram a single or double line?
The Saraigarh Junction – Lalitgram line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Saraigarh Junction – Lalitgram line?
21 trains run over the Saraigarh Junction – Lalitgram line.