RailTribe
Lines
Map
Trains
Line

Sasaram Junction – Son Nagar Junction

Sasaram Junction – Son Nagar Junction (SSM–SEB) railway line: 24 km, triple electric broad gauge. 7 stations and 185 trains, East Central Railway.

Length
24 km
Trains
185 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Triple lineAn extra track that lets more trains run.

Stations on this line · 7

  1. Sasaram Jn SSM 0.0 km
  2. XX-SSMC XX-SSMC 1.0 km
  3. Karwandia KWD 7.5 km
  4. Pahaleja PHE 13.4 km
  5. Dehri On Sone DOS 17.9 km
  6. Advance Starter ADSR 18.7 km
  7. Son Nagar Jn SEB 23.5 km

Quick answers

How long is the Sasaram Junction – Son Nagar Junction line?

The Sasaram Junction – Son Nagar Junction line is about 24 km long, with 7 stations.

Is the Sasaram Junction – Son Nagar Junction line electrified?

Yes. The Sasaram Junction – Son Nagar Junction line is electrified: trains run on electric power from overhead wires.

Is Sasaram Junction – Son Nagar Junction a single or double line?

The Sasaram Junction – Son Nagar Junction line is a triple line. An extra track that lets more trains run.

How many trains use the Sasaram Junction – Son Nagar Junction line?

185 trains run over the Sasaram Junction – Son Nagar Junction line.

Indian railway atlas