Sathupalli – Bhadrachalam Road Chord Cabin
Sathupalli – Bhadrachalam Road Chord Cabin (STPLI–XX-BDCC) railway line: 54 km, single electric broad gauge. 6 stations, South Central Railway.
- Length
- 54 km
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 6
- Kovvur KVR 0.0 km
- Sathupalli STPLI 118.0 km
- Parthasarathipuram PSHP 134.6 km
- Chandrugonda CDRG 150.3 km
- Saravaram SAVR 168.2 km
- XX-BDCC XX-BDCC 171.7 km
Quick answers
How long is the Sathupalli – Bhadrachalam Road Chord Cabin line?
The Sathupalli – Bhadrachalam Road Chord Cabin line is about 54 km long, with 6 stations.
Is the Sathupalli – Bhadrachalam Road Chord Cabin line electrified?
Yes. The Sathupalli – Bhadrachalam Road Chord Cabin line is electrified: trains run on electric power from overhead wires.
Is Sathupalli – Bhadrachalam Road Chord Cabin a single or double line?
The Sathupalli – Bhadrachalam Road Chord Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.