RailTribe
Lines
Map
Trains
Line

Shahbaznagar – Pilibhit Junction

Shahbaznagar – Pilibhit Junction (SZN–PBE) railway line: 79 km, single electric broad gauge. 16 stations and 8 trains, North Eastern Railway.

Length
79 km
Trains
8 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 16

  1. Shahjahanpur Jn SPN 0.0 km
  2. Shahbaznagar SZN 4.1 km
  3. Khiria Khurd KIE 11.0 km
  4. Areli ARX 15.9 km
  5. Dhakia Tiwari DOT 19.0 km
  6. Nigohi NOH 24.6 km
  7. Vazeerpur Halt VZPH 29.7 km
  8. Zindpura ZNP 34.5 km
  9. Chak Safaura Halt CKSR 36.8 km
  10. Mighauna MIW 39.9 km
  11. Bisalpur BSUR 46.5 km
  12. Sherganj SNZ 55.7 km
  13. Bhopatpur BFPA 64.2 km
  14. Pauta PUF 72.2 km
  15. Pratabpur PTPR 77.1 km
  16. Pilibhit Jn PBE 83.6 km

Quick answers

How long is the Shahbaznagar – Pilibhit Junction line?

The Shahbaznagar – Pilibhit Junction line is about 79 km long, with 16 stations.

Is the Shahbaznagar – Pilibhit Junction line electrified?

Yes. The Shahbaznagar – Pilibhit Junction line is electrified: trains run on electric power from overhead wires.

Is Shahbaznagar – Pilibhit Junction a single or double line?

The Shahbaznagar – Pilibhit Junction line is a single line. Trains in both directions share one track and wait at stations to cross.

How many trains use the Shahbaznagar – Pilibhit Junction line?

8 trains run over the Shahbaznagar – Pilibhit Junction line.

Indian railway atlas