Shahdara A Panel – Sahibabad Junction
Shahdara A Panel – Sahibabad Junction (DSAP–SBB) railway line: 3 km, double electric broad gauge. 2 stations and 181 trains, Northern Railway.
- Length
- 3 km
- Trains
- 181 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 2
- Shahdara A Panel DSAP 0.0 km
- Sahibabad Jn SBB 2.9 km
Quick answers
How long is the Shahdara A Panel – Sahibabad Junction line?
The Shahdara A Panel – Sahibabad Junction line is about 3 km long, with 2 stations.
Is the Shahdara A Panel – Sahibabad Junction line electrified?
Yes. The Shahdara A Panel – Sahibabad Junction line is electrified: trains run on electric power from overhead wires.
Is Shahdara A Panel – Sahibabad Junction a single or double line?
The Shahdara A Panel – Sahibabad Junction line is a double line. One track for each direction, so trains do not wait to cross.
How many trains use the Shahdara A Panel – Sahibabad Junction line?
181 trains run over the Shahdara A Panel – Sahibabad Junction line.