Shri Singaji TPP Siding – Bir
Shri Singaji TPP Siding – Bir (PSSS–BIR) railway line: 7 km, single electric broad gauge. 2 stations, West Central Railway.
- Length
- 7 km
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 2
- Shri Singaji TPP Siding PSSS 0.0 km
- Bir BIR 7.5 km
Quick answers
How long is the Shri Singaji TPP Siding – Bir line?
The Shri Singaji TPP Siding – Bir line is about 7 km long, with 2 stations.
Is the Shri Singaji TPP Siding – Bir line electrified?
Yes. The Shri Singaji TPP Siding – Bir line is electrified: trains run on electric power from overhead wires.
Is Shri Singaji TPP Siding – Bir a single or double line?
The Shri Singaji TPP Siding – Bir line is a single line. Trains in both directions share one track and wait at stations to cross.