Shrungavarapukota – Kottavalasa Junction
Shrungavarapukota – Kottavalasa Junction (SUP–KTV) railway line: 26 km, double electric broad gauge. 21 stations and 6 trains, East Coast Railway.
- Length
- 26 km
- Speed limit
- 110 km/h
- Trains
- 6 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 21
- Koraput Jn KRPU 0.0 km
- Suku SUKU 11.2 km
- Paliba PBV 18.8 km
- Machhkunda Road MKRD 31.4 km
- Bheja BHJA 42.9 km
- Padua PFU 52.9 km
- Darliput DPC 62.7 km
- Gorapur GPJ 75.4 km
- Araku ARK 85.3 km
- Araku Valley ARKV 91.3 km
- Shimiliguda SMLG 97.0 km
- Karakavalasa KVLS 106.0 km
- Borra Guhalu BGHU 117.5 km
- Chimidipalli CMDP 126.1 km
- Tyada TXD 137.6 km
- Shivalingapuram SLPM 144.2 km
- Boddavara BDVR 156.3 km
- Shrungavarapukota SUP 163.6 km
- Lakkavarapukota LVK 173.2 km
- Mallividu MVW 180.6 km
- Kottavalasa Jn KTV 189.8 km
Quick answers
How long is the Shrungavarapukota – Kottavalasa Junction line?
The Shrungavarapukota – Kottavalasa Junction line is about 26 km long, with 21 stations.
Is the Shrungavarapukota – Kottavalasa Junction line electrified?
Yes. The Shrungavarapukota – Kottavalasa Junction line is electrified: trains run on electric power from overhead wires.
Is Shrungavarapukota – Kottavalasa Junction a single or double line?
The Shrungavarapukota – Kottavalasa Junction line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Shrungavarapukota and Kottavalasa Junction?
Trains can run at up to 110 km/h between Shrungavarapukota and Kottavalasa Junction.
How many trains use the Shrungavarapukota – Kottavalasa Junction line?
6 trains run over the Shrungavarapukota – Kottavalasa Junction line.