Sihor Junction – Bhavnagar Docks
Sihor Junction – Bhavnagar Docks (SOJN–BVRB) railway line: 32 km, single electric broad gauge. 7 stations and 44 trains, Western Railway.
- Length
- 32 km
- Trains
- 44 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 7
- Sihor Jn SOJN 0.0 km
- Khodiyar Mandir KDMR 5.3 km
- Vartej VTJ 10.6 km
- Nari Road NROD 13.7 km
- Bhavnagar Para BVP 17.7 km
- Bhavnagar Trm BVC 20.5 km
- Bhavnagar Docks BVRB 31.8 km
Quick answers
How long is the Sihor Junction – Bhavnagar Docks line?
The Sihor Junction – Bhavnagar Docks line is about 32 km long, with 7 stations.
Is the Sihor Junction – Bhavnagar Docks line electrified?
Yes. The Sihor Junction – Bhavnagar Docks line is electrified: trains run on electric power from overhead wires.
Is Sihor Junction – Bhavnagar Docks a single or double line?
The Sihor Junction – Bhavnagar Docks line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Sihor Junction – Bhavnagar Docks line?
44 trains run over the Sihor Junction – Bhavnagar Docks line.