Sikar Junction – Churu Junction
Sikar Junction – Churu Junction (SIKR–CUR) railway line: 90 km, single electric broad gauge. 9 stations and 19 trains, North Western Railway.
- Length
- 90 km
- Trains
- 19 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 9
- Sikar Jn SIKR 0.0 km
- Rashidpur Khori RDK 15.0 km
- Laxmangarh Sikar LNH 27.4 km
- Fatehpur Shekhawati FPS 47.1 km
- Kayamsar QMRS 58.9 km
- Ramgarh Shekhawati RSWT 67.0 km
- Mahansar MWR 72.3 km
- Bissau BUB 78.5 km
- Churu Jn CUR 90.4 km
Quick answers
How long is the Sikar Junction – Churu Junction line?
The Sikar Junction – Churu Junction line is about 90 km long, with 9 stations.
Is the Sikar Junction – Churu Junction line electrified?
Yes. The Sikar Junction – Churu Junction line is electrified: trains run on electric power from overhead wires.
Is Sikar Junction – Churu Junction a single or double line?
The Sikar Junction – Churu Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Sikar Junction – Churu Junction line?
19 trains run over the Sikar Junction – Churu Junction line.