Silak Jhori – Dabpal
Silak Jhori – Dabpal (SZY–DBF) railway line: 43 km, double electric broad gauge. 16 stations and 4 trains, East Coast Railway.
- Length
- 43 km
- Speed limit
- 65 km/h
- Trains
- 4 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 16
- Jagdalpur JDB 0.0 km
- Kumhar Maranga KMEZ 8.9 km
- Tokapal TPQ 17.2 km
- Bade Arapur BDXX 22.5 km
- Dilmili DMK 34.2 km
- Silak Jhori SZY 45.5 km
- Kumhar Sodra KMSD 55.0 km
- Kaklur KKLU 67.0 km
- Kawargaon KWGN 79.1 km
- Dabpal DBF 88.1 km
- Gidam GIZ 99.0 km
- Dantewara DWZ 106.3 km
- Kamalur KMLR 118.8 km
- Bhansi BHNS 131.1 km
- Bacheli BCHL 141.2 km
- Kirandul KRDL 149.8 km
Quick answers
How long is the Silak Jhori – Dabpal line?
The Silak Jhori – Dabpal line is about 43 km long, with 16 stations.
Is the Silak Jhori – Dabpal line electrified?
Yes. The Silak Jhori – Dabpal line is electrified: trains run on electric power from overhead wires.
Is Silak Jhori – Dabpal a single or double line?
The Silak Jhori – Dabpal line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Silak Jhori and Dabpal?
Trains can run at up to 65 km/h between Silak Jhori and Dabpal.
How many trains use the Silak Jhori – Dabpal line?
4 trains run over the Silak Jhori – Dabpal line.