Singapur Road B Cabin – Therubali
Singapur Road B Cabin – Therubali (SPBC–THV) railway line: 5 km, double electric broad gauge. 8 stations and 120 trains, East Coast Railway.
- Length
- 5 km
- Speed limit
- 110 km/h
- Trains
- 120 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
- Work
- TriplingA third track is being built.
Stations on this line · 8
- Singapur Road B Cabin SPBC 0.0 km
- Therubali THV 5.4 km
- Bissamcuttack BMCK 23.9 km
- Sansartali SNRL 29.6 km
- Muniguda MNGD 40.7 km
- Doikallu DKLU 54.0 km
- Ambodala AMB 66.1 km
- Lanjigarh Road Jn LJR 79.5 km
Quick answers
How long is the Singapur Road B Cabin – Therubali line?
The Singapur Road B Cabin – Therubali line is about 5 km long, with 8 stations.
Is the Singapur Road B Cabin – Therubali line electrified?
Yes. The Singapur Road B Cabin – Therubali line is electrified: trains run on electric power from overhead wires.
Is Singapur Road B Cabin – Therubali a single or double line?
The Singapur Road B Cabin – Therubali line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Singapur Road B Cabin and Therubali?
Trains can run at up to 110 km/h between Singapur Road B Cabin and Therubali.
How many trains use the Singapur Road B Cabin – Therubali line?
120 trains run over the Singapur Road B Cabin – Therubali line.