Sitapur Junction – DaliGanj Junction
Sitapur Junction – DaliGanj Junction (STP–DAL) railway line: 82 km, single electric broad gauge. 12 stations and 12 trains, North Eastern Railway.
- Length
- 82 km
- Speed limit
- 110 km/h
- Trains
- 12 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 12
- Sitapur Jn STP 0.0 km
- Khairabad Awadh KB 6.0 km
- Barai Jalalpur BJLP 15.7 km
- Kamlapur KMP 24.0 km
- Suraincha SUIA 29.6 km
- Sidhauli SD 34.8 km
- Manwa MANW 43.0 km
- Ataria AA 47.5 km
- Itaunja IJ 58.5 km
- Bakshi Ka Talab BKT 69.0 km
- Mohibullapur MBP 77.9 km
- DaliGanj Jn DAL 81.9 km
Quick answers
How long is the Sitapur Junction – DaliGanj Junction line?
The Sitapur Junction – DaliGanj Junction line is about 82 km long, with 12 stations.
Is the Sitapur Junction – DaliGanj Junction line electrified?
Yes. The Sitapur Junction – DaliGanj Junction line is electrified: trains run on electric power from overhead wires.
Is Sitapur Junction – DaliGanj Junction a single or double line?
The Sitapur Junction – DaliGanj Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Sitapur Junction and DaliGanj Junction?
Trains can run at up to 110 km/h between Sitapur Junction and DaliGanj Junction.
How many trains use the Sitapur Junction – DaliGanj Junction line?
12 trains run over the Sitapur Junction – DaliGanj Junction line.