Surendranagar West Cabin – Botad Junction
Surendranagar West Cabin – Botad Junction (SUNW–BTD) railway line: 76 km, single electric broad gauge. 10 stations and 36 trains, Western Railway.
- Length
- 76 km
- Trains
- 36 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 10
- Surendranagar West Cabin SUNW 0.0 km
- Surendranagar Gate SRGT 0.7 km
- Joravarnagar JVN 3.4 km
- Wadhwan City WC 7.0 km
- Limbdi LM 27.4 km
- Chuda CDA 37.4 km
- Vejalka VJK 46.4 km
- Ranpur RUR 53.7 km
- Kundli KDI 64.5 km
- Botad Jn BTD 75.9 km
Quick answers
How long is the Surendranagar West Cabin – Botad Junction line?
The Surendranagar West Cabin – Botad Junction line is about 76 km long, with 10 stations.
Is the Surendranagar West Cabin – Botad Junction line electrified?
Yes. The Surendranagar West Cabin – Botad Junction line is electrified: trains run on electric power from overhead wires.
Is Surendranagar West Cabin – Botad Junction a single or double line?
The Surendranagar West Cabin – Botad Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Surendranagar West Cabin – Botad Junction line?
36 trains run over the Surendranagar West Cabin – Botad Junction line.