Tatanagar Junction – Aunlajori Junction
Tatanagar Junction – Aunlajori Junction (TATA–OND) railway line: 55 km, single electric broad gauge. 5 stations and 12 trains, South Eastern Railway.
- Length
- 55 km
- Speed limit
- 90 km/h
- Trains
- 12 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 5
- Tatanagar Jn TATA 0.0 km
- Haludpukur HLD 22.3 km
- Sidhirsai SDHS 34.0 km
- Bahalda Road BDO 42.1 km
- Aunlajori Jn OND 55.2 km
Quick answers
How long is the Tatanagar Junction – Aunlajori Junction line?
The Tatanagar Junction – Aunlajori Junction line is about 55 km long, with 5 stations.
Is the Tatanagar Junction – Aunlajori Junction line electrified?
Yes. The Tatanagar Junction – Aunlajori Junction line is electrified: trains run on electric power from overhead wires.
Is Tatanagar Junction – Aunlajori Junction a single or double line?
The Tatanagar Junction – Aunlajori Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Tatanagar Junction and Aunlajori Junction?
Trains can run at up to 90 km/h between Tatanagar Junction and Aunlajori Junction.
How many trains use the Tatanagar Junction – Aunlajori Junction line?
12 trains run over the Tatanagar Junction – Aunlajori Junction line.