RailTribe
Lines
Map
Trains
Line

Thakurganj – Aluabari Road Junction

Thakurganj – Aluabari Road Junction (TKG–AUB) railway line: 20 km, single electric broad gauge. 13 stations and 24 trains, Northeast Frontier Railway.

Length
20 km
Trains
24 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.
Work
DoublingA second track is being built.

Stations on this line · 13

  1. Siliguri Jn SGUJ 0.0 km
  2. Matigara MTRA 3.6 km
  3. Bagdogra BORA 10.0 km
  4. Hatighisa HTA 18.5 km
  5. Naksalbari NAK 22.9 km
  6. Batasi BTSI 31.6 km
  7. Adhikari ADQ 35.5 km
  8. Galgalia GAGA 44.3 km
  9. Piprithan PPTN 50.2 km
  10. Thakurganj TKG 56.2 km
  11. Taiabpur TBR 62.9 km
  12. Pothia POT 71.4 km
  13. Aluabari Road Jn AUB 76.2 km

Quick answers

How long is the Thakurganj – Aluabari Road Junction line?

The Thakurganj – Aluabari Road Junction line is about 20 km long, with 13 stations.

Is the Thakurganj – Aluabari Road Junction line electrified?

Yes. The Thakurganj – Aluabari Road Junction line is electrified: trains run on electric power from overhead wires.

Is Thakurganj – Aluabari Road Junction a single or double line?

The Thakurganj – Aluabari Road Junction line is a single line. Trains in both directions share one track and wait at stations to cross.

How many trains use the Thakurganj – Aluabari Road Junction line?

24 trains run over the Thakurganj – Aluabari Road Junction line.

Indian railway atlas