Thakurganj – Aluabari Road Junction
Thakurganj – Aluabari Road Junction (TKG–AUB) railway line: 20 km, single electric broad gauge. 13 stations and 24 trains, Northeast Frontier Railway.
- Length
- 20 km
- Trains
- 24 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
- Work
- DoublingA second track is being built.
Stations on this line · 13
- Siliguri Jn SGUJ 0.0 km
- Matigara MTRA 3.6 km
- Bagdogra BORA 10.0 km
- Hatighisa HTA 18.5 km
- Naksalbari NAK 22.9 km
- Batasi BTSI 31.6 km
- Adhikari ADQ 35.5 km
- Galgalia GAGA 44.3 km
- Piprithan PPTN 50.2 km
- Thakurganj TKG 56.2 km
- Taiabpur TBR 62.9 km
- Pothia POT 71.4 km
- Aluabari Road Jn AUB 76.2 km
Quick answers
How long is the Thakurganj – Aluabari Road Junction line?
The Thakurganj – Aluabari Road Junction line is about 20 km long, with 13 stations.
Is the Thakurganj – Aluabari Road Junction line electrified?
Yes. The Thakurganj – Aluabari Road Junction line is electrified: trains run on electric power from overhead wires.
Is Thakurganj – Aluabari Road Junction a single or double line?
The Thakurganj – Aluabari Road Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Thakurganj – Aluabari Road Junction line?
24 trains run over the Thakurganj – Aluabari Road Junction line.