Tilaiya Junction – Natesar Junction
Tilaiya Junction – Natesar Junction (TIA–NES) railway line: 28 km, single electric broad gauge. 7 stations and 8 trains, East Central Railway.
- Length
- 28 km
- Speed limit
- 50 km/h
- Trains
- 8 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 7
- Tilaiya Jn TIA 0.0 km
- Hisua Halt HIS 3.9 km
- Mohamad Pur Halt MMDP 5.9 km
- Oro Jagdishpur JDPR 9.9 km
- Sarsu Halt SRSO 17.4 km
- Jethian JTIN 21.7 km
- Natesar Jn NES 28.5 km
Quick answers
How long is the Tilaiya Junction – Natesar Junction line?
The Tilaiya Junction – Natesar Junction line is about 28 km long, with 7 stations.
Is the Tilaiya Junction – Natesar Junction line electrified?
Yes. The Tilaiya Junction – Natesar Junction line is electrified: trains run on electric power from overhead wires.
Is Tilaiya Junction – Natesar Junction a single or double line?
The Tilaiya Junction – Natesar Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Tilaiya Junction and Natesar Junction?
Trains can run at up to 50 km/h between Tilaiya Junction and Natesar Junction.
How many trains use the Tilaiya Junction – Natesar Junction line?
8 trains run over the Tilaiya Junction – Natesar Junction line.