RailTribe
Lines
Map
Trains
Line

Vyasnagar – New West Cabin

Vyasnagar – New West Cabin (VYN–NEWC) railway line: 6 km, double electric broad gauge. 7 stations and 121 trains, Northern Railway.

Length
6 km
Speed limit
100 km/h
Trains
121 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 7

  1. Varanasi Jn BSB 0.0 km
  2. Kashi KEI 5.4 km
  3. Baba Bhagwan Ram Halt BBRM 7.6 km
  4. Vyasnagar VYN 10.8 km
  5. Block Hut B BHBV 15.0 km
  6. New West Cabin NEWC 16.9 km
  7. DDU Jn DDU 18.1 km

Quick answers

How long is the Vyasnagar – New West Cabin line?

The Vyasnagar – New West Cabin line is about 6 km long, with 7 stations.

Is the Vyasnagar – New West Cabin line electrified?

Yes. The Vyasnagar – New West Cabin line is electrified: trains run on electric power from overhead wires.

Is Vyasnagar – New West Cabin a single or double line?

The Vyasnagar – New West Cabin line is a double line. One track for each direction, so trains do not wait to cross.

What is the speed limit between Vyasnagar and New West Cabin?

Trains can run at up to 100 km/h between Vyasnagar and New West Cabin.

How many trains use the Vyasnagar – New West Cabin line?

121 trains run over the Vyasnagar – New West Cabin line.

Indian railway atlas