Warangal – Mahbubabad
Warangal – Mahbubabad (WL–MABD) railway line: 60 km, triple electric broad gauge. 13 stations and 177 trains, South Central Railway.
- Length
- 60 km
- Speed limit
- 130 km/h
- Trains
- 177 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Triple lineAn extra track that lets more trains run.
Stations on this line · 13
- Kazipet F Cabin KZJF 0.0 km
- Warangal WL 8.6 km
- Vanchangiri SQZ 15.6 km
- Chintalpalli CLE 21.1 km
- Yelgur YGL 28.7 km
- Nekonda NKD 38.3 km
- Intakanne INK 47.8 km
- Kesamudram KDM 53.8 km
- Tadla Pusapalli TAA 63.0 km
- Mahbubabad MABD 68.7 km
- Gundratimadugu GUU 80.3 km
- Garla GLA 88.5 km
- Dornakal Jn DKJ 93.3 km
Quick answers
How long is the Warangal – Mahbubabad line?
The Warangal – Mahbubabad line is about 60 km long, with 13 stations.
Is the Warangal – Mahbubabad line electrified?
Yes. The Warangal – Mahbubabad line is electrified: trains run on electric power from overhead wires.
Is Warangal – Mahbubabad a single or double line?
The Warangal – Mahbubabad line is a triple line. An extra track that lets more trains run.
What is the speed limit between Warangal and Mahbubabad?
Trains can run at up to 130 km/h between Warangal and Mahbubabad.
How many trains use the Warangal – Mahbubabad line?
177 trains run over the Warangal – Mahbubabad line.