RailTribe
Lines
Map
Trains
Line

Y-Leg Connection Cabin – Maynaguri Road

Y-Leg Connection Cabin – Maynaguri Road (YLSC–MYGD) railway line: 6 km, single electric broad gauge. 2 stations and 8 trains, Northeast Frontier Railway.

Length
6 km
Speed limit
80 km/h
Trains
8 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 2

  1. Y-Leg Connection Cabin YLSC 0.0 km
  2. Maynaguri Road MYGD 6.2 km

Quick answers

How long is the Y-Leg Connection Cabin – Maynaguri Road line?

The Y-Leg Connection Cabin – Maynaguri Road line is about 6 km long, with 2 stations.

Is the Y-Leg Connection Cabin – Maynaguri Road line electrified?

Yes. The Y-Leg Connection Cabin – Maynaguri Road line is electrified: trains run on electric power from overhead wires.

Is Y-Leg Connection Cabin – Maynaguri Road a single or double line?

The Y-Leg Connection Cabin – Maynaguri Road line is a single line. Trains in both directions share one track and wait at stations to cross.

What is the speed limit between Y-Leg Connection Cabin and Maynaguri Road?

Trains can run at up to 80 km/h between Y-Leg Connection Cabin and Maynaguri Road.

How many trains use the Y-Leg Connection Cabin – Maynaguri Road line?

8 trains run over the Y-Leg Connection Cabin – Maynaguri Road line.

Indian railway atlas