Yamuna South Bank – Khairar Junction
Yamuna South Bank – Khairar Junction (JSB–KID) railway line: 58 km, double electric broad gauge. 15 stations and 10 trains, North Central Railway.
- Length
- 58 km
- Speed limit
- 110 km/h
- Trains
- 10 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 15
- Bhimsen Jn BZM 0.0 km
- Sirhi Itara SIRA 6.7 km
- Kathara Road KTRR 13.2 km
- Patara PTRE 23.4 km
- Ghatampur GTM 33.1 km
- Dohru DXU 39.9 km
- Hamirpur Road HAR 48.4 km
- Dapsaura DPSR 55.0 km
- Yamuna South Bank JSB 61.5 km
- Bharuwa Sumerpur BSZ 72.1 km
- Ingohta IGTA 80.9 km
- Ragaul RGU 89.3 km
- Akona AKW 101.2 km
- Ichauli ICL 108.7 km
- Khairar Jn KID 119.2 km
Quick answers
How long is the Yamuna South Bank – Khairar Junction line?
The Yamuna South Bank – Khairar Junction line is about 58 km long, with 15 stations.
Is the Yamuna South Bank – Khairar Junction line electrified?
Yes. The Yamuna South Bank – Khairar Junction line is electrified: trains run on electric power from overhead wires.
Is Yamuna South Bank – Khairar Junction a single or double line?
The Yamuna South Bank – Khairar Junction line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Yamuna South Bank and Khairar Junction?
Trains can run at up to 110 km/h between Yamuna South Bank and Khairar Junction.
How many trains use the Yamuna South Bank – Khairar Junction line?
10 trains run over the Yamuna South Bank – Khairar Junction line.