54756 Shri Ganganagar Junction Bathinda Junction Passenger
Shri Ganganagar Junction → Bathinda Junction
54756 Shri Ganganagar Junction Bathinda Junction Passenger runs Shri Ganganagar Junction to Bathinda Junction daily: departs 5:30 PM, arrives 8:40 PM, 126 km in 3h 10m, 18 halts.
- Train number
- 54756
- Name on tickets
- SGNR-BTI PASSENGER
- Type
- PassengerSlow train that stops at most stations, with low, mostly unreserved fares.
- Departs
- 5:30 PM from Shri Ganganagar Junction
- Arrives
- 8:40 PM at Bathinda Junction
- Runs
- Daily
- Distance
- 126 km
- Journey time
- 3h 10m
- Top speed
- 69 km/h
- Punctuality
- 94% on time, average delay 7 min (recent runs)
- Classes
- Sleeper (SL)
- Zone
- North Western Railway
Coach order
From the engine: SLRD · S1 · GEN · GEN · GEN · GEN · GEN · GEN · GEN · GEN · GEN · GEN · SRD
Timetable · 18 halts
| Arrives | Station | Departs | PF | km |
|---|---|---|---|---|
| Starts | Shri Ganganagar SGNR | 5:30 PM | 3 | 0 |
| 5:37 PM | Mohanpura MOPR | 5:38 PM | 5.8 | |
| 5:47 PM | Fatuhi FTH | 5:48 PM | 1 | 15.4 |
| 5:54 PM | Orki ORKI | 5:55 PM | 20.4 | |
| 6:02 PM | Hindumalkote HMK | 6:03 PM | 1 | 25.7 |
| 6:09 PM | Kotha Pakki KTPK | 6:10 PM | 29.3 | |
| 6:16 PM | Bakayanwala BKWA | 6:17 PM | 33.1 | |
| 6:24 PM | Panj Kosi PJK | 6:25 PM | 1 | 39.1 |
| 6:32 PM | Kilanwali Punjb KLWL | 6:33 PM | 45.4 | |
| 6:42 PM | Abohar ABS | 6:47 PM | 2 | 53.1 |
| 7:09 PM | Bahawal Basi BFE | 7:10 PM | 61 | |
| 7:18 PM | Pakki PKK | 7:19 PM | 1 | 68 |
| 7:38 PM | Malout MOT | 7:40 PM | 1 | 82.6 |
| 7:49 PM | Faqarsar FSR | 7:50 PM | 90.6 | |
| 7:57 PM | Giddarbaha GDB | 7:59 PM | 1 | 98.7 |
| 8:11 PM | Bulluana BHX | 8:12 PM | 1 | 110.4 |
| 8:19 PM | Bahman Diwana BWX | 8:20 PM | 116.7 | |
| 8:40 PM | Bathinda BTI | Ends | 7 | 126.3 |
Quick answers
When does 54756 Shri Ganganagar Junction Bathinda Junction Passenger leave Shri Ganganagar Junction?
54756 Shri Ganganagar Junction Bathinda Junction Passenger leaves Shri Ganganagar Junction at 5:30 PM and reaches Bathinda Junction at 8:40 PM.
Which days does 54756 run?
54756 Shri Ganganagar Junction Bathinda Junction Passenger runs every day.
How long is the 54756 journey?
The 54756 Shri Ganganagar Junction Bathinda Junction Passenger journey from Shri Ganganagar Junction to Bathinda Junction is 126 km and takes 3h 10m, with 18 halts.
Which classes does 54756 have?
54756 Shri Ganganagar Junction Bathinda Junction Passenger has Sleeper (SL).
Is 54756 usually on time?
54756 Shri Ganganagar Junction Bathinda Junction Passenger was on time on 94% of recent runs, with an average delay of 7 minutes.
Which train runs the other way?
54755 Bathinda Junction Shri Ganganagar Junction Passenger runs the other way, from Bathinda Junction to Shri Ganganagar Junction.