RailTribe
Lines
Map
Trains
Train · Passenger

56103 Erode Junction Mettur Dam Passenger

Erode Junction → Mettur Dam

56103 Erode Junction Mettur Dam Passenger runs Erode Junction to Mettur Dam daily: departs 5:00 AM, arrives 7:45 AM, 101 km in 2h 45m, 11 halts.

Train number
56103
Name on tickets
ED-MTDM PASSENGER
Type
PassengerSlow train that stops at most stations, with low, mostly unreserved fares.
Departs
5:00 AM from Erode Junction
Arrives
7:45 AM at Mettur Dam
Runs
Daily
Distance
101 km
Journey time
2h 45m
Top speed
72 km/h
Punctuality
18% on time, average delay 19 min (recent runs)
Classes
GEN
Zone
Southern Railway
Return train
56104 Mettur Dam Erode Junction Passenger

Coach order

From the engine: SLRD · GEN · GEN

Timetable · 11 halts

ArrivesStationDepartsPFkm
StartsErode Jn ED5:00 AM40
5:09 AMCauvery CV5:10 AM14.9
5:19 AMAnangur ANU5:20 AM113.5
5:29 AMSankaridurg SGE5:30 AM121.8
5:37 AMMavelipalaiyam MVPM5:38 AM126.8
5:49 AMMagudanchavadi DC5:50 AM139.5
5:59 AMVirapandy Road VRPD6:00 AM250.3
6:17 AMSalem Jn SA6:20 AM560.3
6:39 AMOmalur OML6:40 AM171.6
6:59 AMMecheri Road MCRD7:00 AM188.1
7:45 AMMettur Dam MTDMEnds1100.7

Quick answers

When does 56103 Erode Junction Mettur Dam Passenger leave Erode Junction?

56103 Erode Junction Mettur Dam Passenger leaves Erode Junction at 5:00 AM and reaches Mettur Dam at 7:45 AM.

Which days does 56103 run?

56103 Erode Junction Mettur Dam Passenger runs every day.

How long is the 56103 journey?

The 56103 Erode Junction Mettur Dam Passenger journey from Erode Junction to Mettur Dam is 101 km and takes 2h 45m, with 11 halts.

Which classes does 56103 have?

56103 Erode Junction Mettur Dam Passenger has GEN.

Is 56103 usually on time?

56103 Erode Junction Mettur Dam Passenger was on time on 18% of recent runs, with an average delay of 19 minutes.

Which train runs the other way?

56104 Mettur Dam Erode Junction Passenger runs the other way, from Mettur Dam to Erode Junction.

Indian railway atlas