RailTribe
Lines
Map
Trains
Train · Passenger

59228 Bhavnagar Terminus Surendranagar Junction Passenger

Bhavnagar Terminus → Surendranagar Junction

59228 Bhavnagar Terminus Surendranagar Junction Passenger runs Bhavnagar Terminus to Surendranagar Junction daily: departs 5:05 AM, arrives 9:15 AM, 170 km in 4h 10m, 21 halts.

Train number
59228
Name on tickets
BVC-SUNR PASSENGER
Type
PassengerSlow train that stops at most stations, with low, mostly unreserved fares.
Departs
5:05 AM from Bhavnagar Terminus
Arrives
9:15 AM at Surendranagar Junction
Runs
Daily
Distance
170 km
Journey time
4h 10m
Top speed
77 km/h
Punctuality
14% on time, average delay 19 min (recent runs)
Classes
Second sitting (2S), GEN
Zone
Western Railway
Return train
59227 Surendranagar Junction Bhavnagar Terminus Passenger

Coach order

From the engine: SLRD · GEN · GEN · GEN · GEN · GEN · GEN · GEN · GEN · GEN · GEN · SLRD

Timetable · 21 halts

ArrivesStationDepartsPFkm
StartsBhavnagar Terminus BVC5:05 AM30
5:13 AMBhavanagar Para BVP5:14 AM12.6
5:24 AMVartej VTJ5:25 AM19.8
5:36 AMSihor Gujarat SOJN5:37 AM120.3
5:44 AMSongadh SGD5:45 AM227.8
5:53 AMSanosara SOA5:54 AM138.1
6:04 AMDhola Jn DLJ6:05 AM149.3
6:15 AMUjalvav UJ6:16 AM159.6
6:23 AMAlampur ALMR6:24 AM166.1
6:32 AMNingala NGA6:33 AM173.9
6:40 AMLathidad LTD6:41 AM181.1
7:00 AMBotad Jn BTD7:02 AM292.2
7:15 AMKundli KDI7:16 AM1103.6
7:26 AMRanpur RUR7:27 AM1114.4
7:35 AMVejalka VJK7:36 AM121.7
7:44 AMChuda CDA7:45 AM1130.7
8:00 AMLimbdi LM8:01 AM1140.8
8:30 AMWadhwan City WC8:31 AM1161.1
8:35 AMJorawarnagar Jn JVN8:36 AM164.7
8:41 AMSurendranagar G SRGT8:42 AM167.4
9:15 AMSurendranagar SUNREnds4169.8

Quick answers

When does 59228 Bhavnagar Terminus Surendranagar Junction Passenger leave Bhavnagar Terminus?

59228 Bhavnagar Terminus Surendranagar Junction Passenger leaves Bhavnagar Terminus at 5:05 AM and reaches Surendranagar Junction at 9:15 AM.

Which days does 59228 run?

59228 Bhavnagar Terminus Surendranagar Junction Passenger runs every day.

How long is the 59228 journey?

The 59228 Bhavnagar Terminus Surendranagar Junction Passenger journey from Bhavnagar Terminus to Surendranagar Junction is 170 km and takes 4h 10m, with 21 halts.

Which classes does 59228 have?

59228 Bhavnagar Terminus Surendranagar Junction Passenger has Second sitting (2S), GEN.

Is 59228 usually on time?

59228 Bhavnagar Terminus Surendranagar Junction Passenger was on time on 14% of recent runs, with an average delay of 19 minutes.

Which train runs the other way?

59227 Surendranagar Junction Bhavnagar Terminus Passenger runs the other way, from Surendranagar Junction to Bhavnagar Terminus.

Indian railway atlas